Construction Surveying Services for the Marble Bar Road Upgrade
Engineering and construction surveying support delivered for Decmil on Section 3 of the Marble Bar Road Upgrade in the Pilbara, supporting major remote infrastructure delivery across regional Western Australia.
Pilbara Road Construction Surveying Services
Synergy Surveys is providing engineering and construction surveying services for Section 3 of the Marble Bar Road Upgrade, supporting remote infrastructure delivery across the Pilbara region.
Working directly with Decmil, our team delivers practical survey support across civil earthworks, road construction, machine control, survey control and quantity reporting workflows within demanding remote construction environments.
Project: Marble Bar Road Upgrade – Section 3
Project Overview
The Marble Bar Road Upgrade is a major regional infrastructure project designed to improve safety, freight efficiency and long-term transport reliability across remote sections of the Pilbara road network.
Section 3 involves the upgrade and realignment of approximately 22.95 kilometres of roadway to Main Roads WA standards, supporting safer access for mining operations, freight transport and regional communities.
Synergy Surveys is supporting Decmil with practical construction surveying services throughout project delivery, assisting civil earthworks, road construction, machine control operations, survey control and project quantity reporting across active work fronts.
This project forms part of the wider Marble Bar Road Upgrade initiative being delivered under HanRoy management on behalf of Atlas Iron and Hancock Prospecting interests.
Surveying Services Delivered
Synergy Surveys delivers practical construction surveying support across remote infrastructure projects throughout the Pilbara, supporting efficient construction workflows and reliable project delivery.
Survey Control Establishment
Establishment and maintenance of over 360 high-accuracy survey control networks installed to SP1 standards supporting road construction, machine guidance and construction verification activities.
Construction Setout
Setout support for civil earthworks, concrete structures, access works, mechanical installations and piping-related construction activities.
Road Construction Setout
Construction setout support for earthworks, Clearing, Heritage, pavement layers, drainage infrastructure, batters, alignments and associated civil works.
Machine Control Support
Machine guidance support including over 550 3d models for various machine control systems. Calibration, design updates, site validation and field verification across active earthmoving operations.
UAV Aerial Surveying
Drone surveying and aerial mapping supporting topographic surveys, quantity calculations, progress tracking and corridor monitoring across remote construction areas.
Over the life of the project, Synergy Surveys has completed UAV aerial surveying across more than 46,000,000m² of road corridor, providing high-resolution spatial data to support planning, construction tracking and project delivery workflows.
Quantity Reporting & Forecasting
Construction quantity reporting and volumetric analysis supporting progress claims, forecasting, planning and commercial tracking throughout delivery.
QA Verification & As-Constructed Surveys
Verification surveys and as-constructed reporting supporting compliance with project specifications and Main Roads WA construction requirements.
Supporting Remote Infrastructure Delivery in the Pilbara
Remote infrastructure projects across the Pilbara require practical survey support, responsive mobilisation and reliable spatial data throughout all stages of construction delivery.
Synergy Surveys supports contractors operating within demanding regional environments where project efficiency, machine control accuracy and consistent survey workflows are critical to maintaining programme and production targets.
Working directly with Decmil, our team provides integrated survey support across road construction, civil earthworks and remote infrastructure delivery activities throughout the Marble Bar region.
Survey Support for Future Project Packages
As additional contractors and subcontractors become involved in later packages of the Coastal Water Supply Sustaining Project, Synergy Surveys is positioned to provide responsive construction surveying support across civil, structural, mechanical, piping, earthworks and infrastructure-related scopes.
Our team can assist future package contractors with mobilisation, survey control, construction setout, UAV aerial surveying, QA verification, as-constructed surveys and project quantity reporting throughout Karratha, Dampier and the Pilbara.
Need Construction Surveyors for a Remote WA Infrastructure Project?
Synergy Surveys provides practical engineering, construction and UAV surveying support for road construction, civil infrastructure and remote industrial projects throughout the Pilbara and regional Western Australia.